solitel.blogg.se

Fission uranium drill results
Fission uranium drill results












After a short break in the drill program, field crews have remobilized to Moore and an anticipated 1,500 to 2,000 metres in four to five holes are yet to be drilled.

fission uranium drill results

Complete results for holes ML21-01 to -05 have been received and reported herein, while samples for the latter seven holes have been delivered to the SRC Geoanalytical Laboratories in Saskatoon. Seven holes (ML21-01 to -05 and ML21-12 and -13) were drilled on the Maverick East Zone, three on the Esker Target (ML21-06, -10, -11) and three on the Grid 19 Target conductors (ML21-07 to -09). Summary of 2021 Drilling Program to Date:ĭrilling to date in 2021 on the Moore Project has totalled 4,578 metres in thirteen holes.

fission uranium drill results

The remaining assay results from the drill program are pending which will provide additional news flow in the months to come amidst a significant resurgence in the uranium market.” Furthermore, there is good progress being made at regional targets at Moore and we intend to follow up on other high-priority targets throughout the Project. We are successfully increasing the size of the high grade zones at the Maverick corridor and these results illustrate the notable discovery upside potential at the Project especially in the basement rock feeder-zones which have had limited drill-testing historically. Our geological team is continuing to explore for higher grade uranium mineralization along strike and down plunge at this zone with an expanded drill program. Jordan Trimble, President and CEO of Skyharbour Resources, stated: “We are thrilled with the first batch of drill results announced herein highlighted by drill hole ML21-03 which returned the best intercept to date in the basement rocks at the Maverick East Zone.

  • Additional drilling of 1,500 to 2,000 metres in four to five holes has commenced at Moore.
  • Final assay results are pending for seven more drill holes.
  • The pending geochemical results will further define the prospectivity of this area for winter follow-up when frozen conditions will facilitate additional drilling. All three holes intersected highly prospective altered, graphitic and sulphide bearing basement lithologies.
  • Drill holes ML21-07, -08 and -09 were the first holes drilled within the regional Grid 19 target area, where two prospective EM conductors were identified by this winter’s SML-EM geophysical program.
  • Substantial portions of the 4.7 kilometre long Maverick corridor remain to be systematically drill tested leaving robust discovery potential along strike as well as at depth in the basement rocks.
  • The intercept confirms continuity within the central portion of the Maverick East Zone. This mineralization straddles the unconformity, with most of the interval within basement rocks comprised of sheared, clay-altered to -replaced felsic intrusives.
  • The mineralized intercept in hole ML21-02 occurs in a broad zone that returned 0.19% U 3O 8 over an 11.7 metre interval from 271.8 to 283.5 metres downhole.
  • The uranium mineralization is accompanied by intense clay alteration of pelitic assemblages below the unconformity as well as up to 0.83% Cu and 0.73% Ni in half metre sample intervals.

    fission uranium drill results

    This hole intersected predominantly basement-hosted uranium mineralization and returned 2.54% U 3O 8 over 6.0 metres from 276.0 to 282.0 metres, including 6.8.0% U 3O 8 over 2.0 metres from 278.5 to 280.5 metres. Hole ML21-03 was drilled within the eastern half of the Maverick East Zone.Furthermore, drilling on the regional Grid 19 target identified several prospective geological features that are indicative of uranium mineralizing systems. This hole returned 2.54% U 3O 8 over 6.0 metres including 6.80% U 3O 8 over 2.0 metres. Drillhole ML21-03 intersected additional high grade, basement hosted uranium mineralization at the Maverick East Zone. (TSX-V: SYH ) (OTCQB: SYHBF) (Frankfurt: SC1P ) (the “Company”) is pleased to announce the initial set of diamond drill results from its 2021 summer diamond drilling program at its 100% owned, 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. Vancouver, BC - Skyharbour Resources Ltd. Skyharbour Intersects High Grade Uranium Mineralization at Maverick East Zone with Drill Results of 2.54% U3O8 over 6.0m including 6.80% U3O8 over 2.0m Additional Assays Pending and Drilling to Continue














    Fission uranium drill results